P3 International P3 E9310 User Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
6
5. Preparing for operation
5.1. Open the housing
- Rotate the unit and unscrew the 6 screws (see below)
- Lift up the upper part carefully.
5.2. Inserting the batteries
- The unit is operated with 3 x 1,5 V AA batteries. Use alkaline batteries
for longer life and better protection against leaking.
- Insert the three batteries into the battery holder with right polarity as
shown in the battery holder.
- If you want to make settings (addresses or measuring unit), go to the
next chapter.
- Finally, close the housing. Be sure the temperature sensor is placed in
the correct position in the housing and most importantly that the neopre-
ne seal ring is aligned properly before you close the housing and tighten
the screws. Tighten the screws carefully in a diagonal sequence.
5.3. Setting address and measuring units
Display
Screws
Batteries
Sensor
Eye for fixing
on the ground
Page view 5
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments